Webinar: Create Single-Line Diagrams in Revit Without Late Nights or Change Orders
Wednesday 18 November 2026 @ 1:00 pm - 2:00 pm EST
Free
Single-line diagrams are often drawn separately from the Revit model, which leads to duplicated data and drawings that drift out of sync when the architect changes the plans. This webinar shows how ElectroBIM creates single-line diagrams and the related calculations directly in Revit, so that every sheet draws on the same electrical information.
Programme
- Avoiding duplication errors by keeping all sheets on the same data
- Responding to architectural revisions in minutes rather than days
- Keeping single-line diagrams consistent across people and projects
Speakers
- David Robison, President, Design Master Software
Who it’s for
Electrical engineering firms that produce single-line diagrams and electrical calculations in Revit.

